Repairs of COB No.7 at ArcelorMittal Temirtau
6 November 2020 0:00
As part of a large-scale repair campaign intended to restore operational condition of the coke ovens at ArcelorMittal Temirtau, OKOS team continues a full length rebuilding of heating walls at coke oven battery No.7 (65 ovens, twin vertical flues with waste gas recirculation and underfiring, coking chamber volume 41.3 m3, H=7 m), in the conditions of operating ovens. Along with the worn-out refractory brickwork of the walls, defective equipment is being replaced: i.e., flash plates, door frames, tie-rods, etc.